ATTENTION RESIDENTS AND BUSINESSES IN THE VICINITY OF SEPULVEDA BL. BETWEEN MONTANA AV. AND GETTY/SEPULVEDA RAMPS

 

The contractor will start clearing and grubbing, which is the removal of trees and vegetation along Sepulveda Bl., in preparation for the reconstruction of the Sepulveda Bl. retaining walls and the reconstruction of the Sunset Bridge.

 

What:         Clearing and grubbing

 

When:        Work is anticipated to start on Monday, May 24, 2010 for approximately one month. Anticipated work hours are from 8:00 am to 4:00 pm with some night work from 9:00 pm to 6:00 am, weather permitting.

         

Where:       Sepulveda Bl. between Montana Av. and Sepulveda Way; shoulder and loops in the vicinity of the Sunset Bridge; Sepulveda Bl. between Getty Center Dr. and the Getty/Sepulveda ramps.

 

What to expect:

·         Access to Sepulveda Way will be maintained.

·         Northbound Sepulveda Bl. between Getty Center Dr. and the Getty/Sepulveda ramps will be restricted to one lane of traffic in each direction.

·         Ramp closures will be coordinated with Caltrans; ramp closures may start as early as 7:00 pm.

·         Access to emergency responders will be maintained.

 

 

Olga N. Arroyo

 

I-405 Sepulveda Pass Widening Project

Community Relations

6060 Center Drive, 2nd Flr.

Los Angeles, CA 90045

310-846-2357

ArroyoO@metro.net

 

www.metro.net/I-405

http://twitter.com/I_405

www.facebook.com/405project

 

I-405 Project Hotline 213-922-3665

 

 

 

0 comments: