Monday, September 12, 2011

I-405 Construction Notice: Sunset Bridge-area

ATTENTION COMMUTERS, RESIDENTS, AND BUSINESSES IN THE VICINITY OF THE SUNSET BL BRIDGE AT THE I-405 FREEWAY

The contractor and LADWP will perform final work on the 36” water line located in the Sunset Bl bridge. This work requires a lane reduction on Sunset Bl bridge and the full closure of the NB 405 off-ramp at Sunset for one weekend.

What: Water line replacement

When: Work and closures are anticipated to start at 9pm Friday, September 16 through 6am Monday, September 19, 2011.

Where: Sunset Bl bridge between Church Ln and Sepulveda Way, and
NB 405 off-ramp at Sunset Bl

What to expect:

• Access to businesses and local residents will be maintained.

• Sunset Bl access will be maintained with one lane in each direction.

• Southbound ramps and the northbound on-ramp will remain operational during daytime hours; nighttime closures of the ramps will be dependent on construction progress and will be coordinated with Caltrans. Closures may start as early as 7pm.

• Closure of the NB 405 off-ramp will be required; closures will be coordinated with Caltrans and will start at 9pm Friday, September 16 through 6am Monday, September 19, 2011

• Freeway traffic will be detoured off the freeway at Wilshire Bl.

• Pedestrians will be rerouted to a safe area outside the construction zone.

• Emergency vehicle access will be maintained.

1 comments:

muebles en vizcaya said...

The dude is absolutely right, and there is no question.