Monday, January 23, 2012

405 Work Notice: Potholing on Sepulveda Blvd near Bel-Air Crest Road

ATTENTION COMMUTERS, RESIDENTS AND BUSINESSES IN THE
VICINITY OF SEPULVEDA Bl AND BEL AIR CREST

The contractor will perform potholing operations along Sepulveda Bl in order to survey and
identify existing utilities. The work will be conducted along Sepulveda Bl near Bel Air Crest
Road. This work is anticipated to begin on Wednesday, January 25, 2012, and last
approximately two days between the hours of 9:00 am to 3:00 pm, weather permitting.
During this operation, Sepulveda Bl will be reduced to one lane in each direction.
Residential access will be impacted, with left turns from Sepulveda Bl onto Bel Air Crest
Road and right turns on Sepulveda Bl from Bel Air Crest Road being restricted during this
closure.

What: Potholing for utility identification

When: Work is anticipated to begin on Wednesday, January 25, 2012, and last
approximately two days between the hours of 9:00 am to 3:00 pm,
weather permitting.

Where: Sepulveda Bl near Bel Air Crest Road, with Sepulveda Bl will be reduced
to one lane in each direction.

What to expect:

-Sepulveda Bl will be reduced to one lane in each direction.

-Residential Access will be restricted during the closure, with left turns from
Sepulveda Bl onto Bel Air Crest Road and right turns on Sepulveda Bl from
Bel Air Crest Road being restricted

-Access to emergency vehicles will be maintained.

- Work is weather permitting and subject to change


For a listing of daily closures and project updates visit our website at
www.metro.net/I405 or follow us on twitter: twitter.com/I_405 and Facebook at
facebook.com/405project

0 comments: