Friday, October 19, 2012

Sunset Bridge Testing Operation

ATTENTION COMMUTERS, RESIDENTS AND BUSINESSES IN THE
VICINITY OF THE SAN DIEGO FREEWAY (I-405) AND THE SUNSET
BRIDGE


The Contractor will perform concrete pile testing at the Sunset Bridge
abutments for approximately two hours the night of Thursday, October
18, 2012. The testing requires the use of crane mounted hammer
released onto a below grade timber-covered concrete pile.

What: Below grade-concrete pile testing

When: Testing is anticipated to start on Thursday, October 18, 2012 for
one night only between the hours of 10pm and 5am.

Where: Sunset Bl Bridge at Sepulveda Bl level

What to Expect:
• This activity is anticipated to generate noise and vibration.
• This work will occur within the limits of the nightly closure of
Sepulveda Bl between Montana Av and Church Ln/Ovada Pl.
• Emergency vehicle access will be maintained.
• Work is weather permitting and subject to change.

0 comments: