Construction Activity Update (Wilshire, Ovada, Sepulveda & Acanto)



2 Notices Below

The Wilshire Segment runs from National Bl to Constitution Av.
The Sunset Segment runs from Constitution Av to the Getty Center Dr ramps.

Wilshire Segment
8/28-9/3: Westbound Wilshire Lane #4 Closure
 Lane #4 on westbound Wilshire Bl will be closed from Sepulveda Bl to the SB I-405 westbound Wilshire Bl on-ramp, 10pm to 6am, from August 28th to September 3rd.

  •  This will facilitate concrete finishing work on the bridge abutment for the southbound off-ramp to eastbound Wilshire Bl.
  • While the original southbound off-ramp to eastbound Wilshire Bl had a length of 1,330 ft, the new off-ramp will have a length of 3,117 ft! That’s a 134% increase in capacity! The ramp is also being built to modern seismic standards.




Sunset Segment
8/28-9/13: Retaining Wall Work, Sepulveda Way to Ovada Pl
There will be work on the retaining wall that runs from the east side of Sepulveda Bl, from Sepulveda Way to Ovada Pl. Work will consist of grading and installation of weep holes.

  • Work will be from August 28th to September 13th.
  • Daytime work hours are from 9am to 3pm.
  • Nighttime work hours are 10pm to 5am.
  • Daytime work will require the closure of northbound Sepulveda Bl lane #2, from Sepulveda Way to Ovada Pl and a full closure of Sepulveda Way.
  • Nighttime work will be done with the nightly full Sepulveda closure.