Thursday, December 12, 2013

12/12-12/14: Church Ln Closed for Bridge Deck Construction



The operation will be conducting a concrete pour for deck construction of the Church Ln bridge undercrossing, from Thursday, December 12th to Saturday, December 14th, from 10pm to 6am.
·         Church Ln will be closed from the SB I-405 Sunset Bl off-ramp to Sepulveda Bl.
·         Sepulveda Bl will be closed from Montana Av to Moraga Dr, in conjunction with other bridge work.
·         Detours:
o   NB Sepulveda Bl:  EB on Wilshire, NB on Beverly Glen, WB on Mulholland Dr, SB on Skirball Center Dr to Sepulveda Bl.  (Vice versa for SB Sepulveda Bl detour).
o   EB Sunset Bl: SB on Church, EB on Montana, to Sepulveda Bl.
o   Traveling SB from Sunset, East of Bridge: EB on Sunset Bl, SB on Veteran Av, WB on Montana Av.
o   Traveling NB from Sunset, West of Bridge: EB on Sunset Blvd, NB on Beverly Glen, WB on Mulholland Dr, SB on Skirball Center Dr to Sepulveda Bl. 
This work is required to widen the Church Ln Bridge, which will accommodate widening of the freeway roadway.
·         A total of twenty-four bridges are being widened or completely reconstructed as part of this project.

Please see attached notice.


0 comments: