Wednesday, February 26, 2014

UPDATE: Sepulveda Full-Depth Reconstruction, Montana Av to Church Ln/Ovada Pl

UPDATE: The lane reduction of Sepulveda Bl (for paving operations) from Montana Av to Church Ln, originally scheduled for February 2014, has been postponed. Ample notification will be given before this work begins.

Information for the original notice is included below:

Postponed:
2/21- 4/6  (6 Weeks): Sepulveda Full-Depth Reconstruction, Montana Av to Church Ln/Ovada Pl
Sepulveda Bl will be reduced to one lane in each direction, from Montana Av to Church Ln/Ovada Pl, 6am to 10pm, from Friday, February 21st, to Sunday, April 6th to facilitate full-depth roadway reconstruction of Sepulveda Bl. Full-depth reconstruction of Sepulveda Bl will consist of demolishing existing asphalt concrete, excavating, grading, compacting, and paving of new roadway.

  • Sepulveda Bl will be fully closed during nighttime hours, from 10pm to 6am, from Montana Av to Church Ln.
  • Starting on Friday, February 28th, Sepulveda Bl will be continuously closed on weekends, from Fridays at 10pm to Mondays at 6am, until Monday, April 6th.
  • Sepulveda Bl will be configured to one lane in each direction of travel during daytime hours on weekdays, Monday to Friday, from 6am to 10pm.

Detour during full closures ONLY:

  • SB Sepulveda, right to WB/SB Church Ln, left to EB Montana, right to SB Sepulveda.
  • NB Sepulveda, left to WB Montana Av, right to NB Church Ln, left to NB Sepulveda.

0 comments: