Friday, March 28, 2014

Construction Notice: Electrical Work, Church Ln from Cashmere to Denair St



Electrical Work, Church Ln from Cashmere to Denair St

Night Closure: Beginning Monday, March 31, to Monday, April 28, 2014, Church Ln will be fully closed intermittently from Cashmere St to Denair St, 9pm to 6am. This closure is for electrical installation work.

·         Day work will occur during non-peak hours, 9am to 3pm with no closures.
·         PM Detour: South on Church Ln, west on Bolas, north on Beloit, east on Denair, north on Church Ln.




Construction Relations I-405 Sepulveda Pass Improvements Project
Tel.: 213.922.3665 Fax: 213.922.2898 



Construction Notice: Southbound Valley Vista on-ramp, southbound Skirball on-and off-ramps



Segment: Mulholland

Location: Southbound Valley Vista On-ramp, southbound Skirball on- and off-ramps, and Sepulveda Bl between Mountaingate and Skirball Center Dr

Notice: Beginning 7pm, Friday, March 28 through 6am, Monday, March 31, 2014, the southbound Valley Vista on-ramp will be closed to grind asphalt, pave the top lift, and restripe the on-ramp. 

Consecutively, the southbound Skirball on- and off-ramps will be closed beginning 9pm Friday, March 28 to 6am, Monday, March 31, to facilitate work on the Sepulveda Bl paving operation between Mountaingate Dr and Skirball Center Dr. 

Beginning 9pm, Friday, March 28, to 6am, Monday, March 31, Sepulveda Bl will be reduced to one lane in each direction between Mountaingate Dr and Skirball Center Dr.

Construction Relations I-405 Sepulveda Pass Improvements Project 
Tel.: 213.922.3665 Fax: 213.922.2898 



Metro: I-405 AM Closures for Friday, March 28, 2014




The abbreviations below help us organize the Daily Updates by segment.
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
SU
MO
TU
WE
TH
FR
SA
All
Wilshire
Sunset
Mulholland
ALL
WIL
SUN
MUL
 


Here are the AM closures for Friday, March 28, 2014. Unless noted below, AM closures occur from 9am to 2:30pm. The latest closure information can be found at metro.net/405. The Wilshire Segment runs from National Bl to Constitution Av. The Sunset Segment runs from Constitution Av to the Getty Center ramps. The Mulholland Segment begins at the Getty Center ramps and ends at Ventura Bl. 

Extended Closure-Mulholland Segment: Beginning 9pm, Friday, March 21 to Monday, April 21, Sepulveda Bl will be reduced from two northbound lanes to one northbound lane between Mountaingate Dr and Skirball Center Dr to conduct roadway construction. See full closure details http://bit.ly/1kGw7hX

Extended Closure-Sunset Segment: There will be full-depth roadway reconstruction on Sepulveda Bl, from Montana Ave to Church Ln/Ovada Pl, from Friday, March 14th at 10pm, to Monday, April 28th at 6am. For more information: http://www.metro.net/projects/I-405/sepulveda-bl-closures/

Streets
FR-WIL: Sepulveda Bl southbound 2 lane closed from Wilshire Bl to north of Ohio Av today.                                                                                                                                                                                        
FR-SUN: Sepulveda Bl reduced to one lane each direction from Montana Av to Church Ln, 6am to 10pm, Monday to Friday.                                                                                                                
FR-MUL: Sepulveda Bl reduced to one lane each direction from Skirball Center Dr to Mountaingate today.                                                                                                          
FR-MUL: Skirball Center Dr southbound 2 lane closed from Mulholland Dr to northbound Skirball on-ramp today.                                                                                                             
FR-MUL: Valley Vista Bl fully closed at Sherman Oaks cul-de-sac today, 9am to 9pm.       

Freeways
FR-WIL: Northbound on-ramp from eastbound Wilshire Bl closed today, 10am to 10:30am.                                                                                                          
FR-WIL: Northbound on-ramp from westbound Wilshire Bl closed today, 10:30 to 11am.                                                                                                               
FR-WIL: Northbound off-ramp to westbound Wilshire Bl closed today, 11 to 11:30am.                    
FR-MUL: Northbound off-ramp to Getty Center Dr closed today.                                                                                                             
FR-MUL: Northbound on-ramp from Skirball Center Dr closed today.
FR-MUL: Southbound off-ramp to Skirball Center Dr closed today.                                                                                                          
FR-MUL: Southbound on-ramp from Skirball Center Dr closed today, 10am to 2:30pm.                                                                                                   
FR-MUL: Southbound on-ramp from Valley Vista Bl closed today, 10am to 2:30pm.          

Construction Relations I-405 Sepulveda Pass Improvements Project 
Tel.: 213.922.3665 Fax: 213.922.2898 

Thursday, March 27, 2014

Construction Notice: SB Sunset Ramps Daytime & Nighttime closure



SB Sunset Ramps Daytime & Nighttime closure

Day and Night Closure: Beginning Wednesday, March 26, to Saturday, April 26, 2014, the southbound Sunset on-ramp and southbound Sunset off-ramp will be closed during non-peak hours of 9am to 3pm and 7pm to 6am. This closure is for installation of drainage pipes, inlets for drainage system, potholing and backfilling work.


Construction Relations I-405 Sepulveda Pass Improvements Project
Tel.: 213.922.3665 Fax: 213.922.2898
Ifyou wish to be unsubscribed from future e-mails, please reply directly to this e-mail with"unsubscribe"in the subject
line.